ASME PEM TRADESHOW
APRIL 10, 2008
TECHNICAL PRESENTATIONS
                 
  Hours   Room A   Room B   Room C  
                 
  11:00 AM - 12:15 PM   P. E. Ethics Presentation - Texas Board of Professional Engineers - (C. W. Clarke)   P. E. Ethics Presentation - Texas Board of Professional Engineers - (C. W. Clarke)   Ultra-High Pressure Water Jet Cutting - Safe Cut -  (Larry Speaks)   
                 
  12:15 PM - 1:30 PM   Practical Gasket and Bolting Application for Leak Free Operation - Leader Global Technologies (Rodney Roth) / Lyondell Basell (Eric Ellis)   A Traveling Solution to Cooling Tower Debris - Industrial Cooling Towers - (Michael Moreaux)   Composite Systems Used to Repair Pipelines and Piping Systems - Stress Engineering Services - (Chris Alexander)  
                 
  1:30 PM - 2:45 PM   Utilizing Load Indicating Fasteners for Industrial Bolted Flange Applications - Lamons (Kris Kolb) / Dow Chemical (Mike Tavary)   Foundation Repair and Grouting of Rotating Equipment - Structural Preservation Systems -  (Paul Raiford / Kraig Tarou)   Integrity Assessment of Fire-Damaged Vessels - Stress Engineering Services - (Mac Samman)  
                 
  2:45 PM - 4:00 PM   Quantifying Strength of Composite Repairs to Piping via the New ASME PCC-2 Code - Neptune Research Inc - (Bart Davis)   Oil-Injected Screw Compressor for Hydrogen Service - KOBELCO EDTI Compressors, Inc - (Takao Koga)   Analysis of Contact Stresses on 3-Bolt Connection Sealing Surfaces Using Self-Energized Tapered Seal - TaperLok - (Rajeev Madazhy)  
                 
  4:00 PM - 5:15 PM   Experiences on the Repair of Pressure Vessels in the Oil & Gas Industry Using Alternative Welding Methods - Welding Services, Inc - (Luis Yepez)   Establishing Methods for Controlling and Managing Tools, Equipment, and Supplies Daily During Turnarounds - Win Ware, Inc - (Gregg Sprinkel)   Case Study -- Flanged Assembly Improvements in Acidic Applications - National Hose / Thermoseal Inc - (Steve Stratton)